Common Problems

Yes, we are.JCGK Jingcheng GongkeIt's the source manufacturer. As a company with deep technical accumulation and rich manufacturing experience, we not only specialize in product development and production, but also committed to providing customers with high-quality technical support and after-sales service. Therefore, you can choose our products and services with confidence.

JCGK Jingcheng GongkeThe instruments are mainly used in new energy, household appliances, automobile parts, consumer electronics, medical equipment, security lighting, valves and pipes, wire connectors and other industries.Air tightness testing, new energy safety testing and non-standard automation customization.

Air tightness testing equipment::Test the product (or component) for watertightness and waterproofness to ensure that there is no water or air leakage defects in the product under test.
 
New Energy Test Equipment::New energy batteries are tested for overturning pressure/bursting pressure test/breathing cycle pressure resistance to ensure their product quality and safety.
 
Non-standard automation equipment::Non-standard customization for various testing needs of the product under test, providing the best solution for customer's product quality and safety.

Yes, you can.JCGK Jingcheng GongkeAlways put the quality in the first place, to ensure that each piece of equipment has gone through a rigorous inspection and testing, the performance of the instrument is comparable to or even exceeded some of the imported brands.

We are committed to creatingBetter domestic alternativesIn order to provide customers with better service and cost-effective products.Let customers enjoy imported quality with domestic price.

In general.The test time depends on the volume of the product under test, the material and the inspection accuracy required.For small products, testing may take only a few seconds to a few minutes to complete. For large or complex products, on the other hand, testing may take longer, even hours.

Standardized instrument production cycle:Some models in stock for immediate shipment.
Instrument production lead time is generally within 5~7 working days.

Tooling production cycle:Fixtures are non-standard customized, usually 15~20 working days.
It needs to go through the process of design and drawing, purchasing, machining, outsourcing plating, assembling, and commissioning!

Overall, general projects can be delivered in about 25 working days! Complex non-standard projects may take longer, you can coordinate the delivery time with our business engineers.